GL–042
HAIGSLEA
HAIGSLEA
Long entry, one quiet gesture.
Black post-and-rail follows the road edge into a 4.2-metre sliding gate. The motor and solar provision were kept clear of the drainage swale.
184m / 1 sliding gate / 8 days
Three fictional project records showing why the same fence is not right for every property.
Black post-and-rail follows the road edge into a 4.2-metre sliding gate. The motor and solar provision were kept clear of the drainage swale.
184m / 1 sliding gate / 8 days
Hardwood posts step with the terrain while the top datum remains calm from the house. Auger access and rock allowance were recorded before mobilisation.
76m / hardwood / 6 days
Spotted-gum battens provide privacy, a steel pedestrian gate handles daily access, and the concrete base resolves the level change at the footpath.
28m / custom gate / 5 days